| No. Ruas | 541 |
| Nama Ruas | Banjarsari Kulon - Karanggintung |
| Panjang (km) | 2.9 |
| Lebar (m) | 3.1 |
| Status | Jalan Kabupaten |
| Fungsi | JLS |
| STA | 0+000 | 0+500 | 1+000 | 1+500 | 2+000 | 2+500 | 2+900 | |||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Panjang (m) | 100 | 100 | 100 | 100 | 100 | 80 | 20 | 100 | 50 | 50 | 100 | 80 | 20 | 100 | 100 | 100 | 80 | 20 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 97 | 3 | 100 | 100 | 100 |
| Lebar (m) | 9.50 | 4.00 | 4.00 | 3.50 | 3.50 | 3.00 | 3.00 | 3.00 | 3.50 | 2.50 | 2.50 | 2.50 | 2.50 | 2.50 | 2.50 | 2.50 | 2.50 | 2.50 | 2.50 | 2.50 | 2.50 | 3.50 | 3.50 | 3.50 | 3.50 | 3.50 | 3.00 | 3.50 | 4.00 | 4.00 | 11.50 | 3.50 | 3.50 | 3.50 |
| Tipe Drainase (L) | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka |
| Tipe Bahu (L) | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
| Perkerasan | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal |
| Tipe Bahu (R) | Tanah | Tanah | Tanah | Tanah | Tanah | Tanah | Tanah | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
| Tipe Drainase (R) | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka |
| Kondisi | Baik | Baik | Baik | Sedang | Rusak Ringan | Sedang | Rusak Ringan | Sedang | Baik | Rusak Berat | Rusak Berat | Rusak Berat | Rusak Berat | Rusak Ringan | Rusak Berat | Baik | Rusak Ringan | Rusak Berat | Rusak Berat | Rusak Berat | Rusak Berat | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Sedang | Sedang | Baik | Baik | Baik | Baik |
| No | No Jembatan | Nama Jembatan |
|---|