No. Ruas | 250 |
Nama Ruas | Parungkamal - Banyumasan |
Panjang (km) | 1.2 |
Lebar (m) | 3.3 |
Status | Jalan Kabupaten |
Fungsi | JLP |
STA | 0+000 | 0+500 | 1+000 | 1+200 | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Panjang (m) | 100 | 100 | 100 | 100 | 100 | 100 | 70 | 30 | 20 | 80 | 100 | 100 | 100 | 100 |
Lebar (m) | 3.00 | 3.00 | 3.00 | 3.00 | 2.50 | 2.50 | 2.50 | 2.50 | 2.50 | 4.00 | 4.00 | 4.00 | 4.00 | 4.00 |
Tipe Drainase (L) | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Tanah | Tanah | Tanah | Tanah | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada |
Tipe Bahu (L) | Beton | Beton | Beton | Beton | Tanah | Tanah | Tanah | Tanah | Tanah | Tanah | Tanah | Tanah | Tanah | Tanah |
Perkerasan | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal |
Tipe Bahu (R) | Beton | Beton | Beton | Beton | Tanah | Tanah | Tanah | Tanah | Tanah | Tanah | Tanah | Tanah | Tanah | Tanah |
Tipe Drainase (R) | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Tanah | Tanah | Tanah | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada |
Kondisi | Baik | Baik | Baik | Baik | Rusak Berat | Rusak Ringan | Sedang | Sedang | Baik | Rusak Ringan | Sedang | Baik | Sedang | Rusak Ringan |