No. Ruas | 510 |
Nama Ruas | Sokaraja Lor - Kedondong |
Panjang (km) | 1.42 |
Lebar (m) | 3.5 |
Status | Jalan Kabupaten |
Fungsi | JLP |
STA | 0+000 | 0+500 | 1+000 | 1+420 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Panjang (m) | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 20 |
Lebar (m) | 3.50 | 3.50 | 3.50 | 3.50 | 3.50 | 3.50 | 3.50 | 3.50 | 3.50 | 3.50 | 3.50 | 3.50 | 3.50 | 3.50 | 3.50 |
Tipe Drainase (L) | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Tertutup | Tidak Ada | Tidak Ada | Pasangan Batu Tertutup | Pasangan Batu Tertutup |
Tipe Bahu (L) | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
Perkerasan | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal |
Tipe Bahu (R) | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
Tipe Drainase (R) | Pasangan Batu Tertutup | Pasangan Batu Tertutup | Pasangan Batu Tertutup | Pasangan Batu Tertutup | Pasangan Batu Tertutup | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Tertutup | Tidak Ada | Pasangan Batu Tertutup | Pasangan Batu Tertutup | Tidak Ada | Tidak Ada |
Kondisi | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik |